• What can be cooked from squid: quick and tasty

    The decision to renovate the bathroom has been made. It remains to dwell on the choice of a specific material and general design. As a result, the bathroom design should be not only gorgeous in appearance, but also practical. Bathroom decoration plastic panels- a very aesthetic and affordable solution. This stuff in modern life very popular. In addition, such a finish is quite possible to do on your own.

    Bathtub decoration with plastic panels is done according to certain rules. First, you need to decide which options for finishing the bath with plastic panels you like more:

    • frame finish;
    • frameless.

    Important! Why is it important to make this choice at the initial stage? Because the installation technique for these cladding methods is different. How to sheathe a bathtub with plastic, and which way to prefer? Let's try to understand each of these options.

    Frame installation

    Bathroom cladding with plastic using the frame method is much more often used in modern repair and construction work. There are a lot of very important advantages and disadvantages here, by looking at which you can decide for yourself how this method suits you.

    As for the indisputable advantages, the following points should be noted:

    • Finishing the bathroom with plastic panels on the frame will perfectly hide the flaws and errors of the old walls. Therefore, you do not have to worry about the unevenness of the walls. You will not need to do long-term and painstaking preparation before directly applying the plastic panels;
    • The frame cladding method will perfectly hide all the elements of communication. As you know, in old apartments, especially with small bathrooms, external pipes only violate the comfort of the bathrooms. And our plastic bathroom decoration will become more harmonious and stylish;
    • Plastic finishing of the bathroom on a frame base will allow the installation of an auxiliary insulation. In this case, heating costs;
    • With the frame cladding method, it will be easy to create extremely smooth walls. The main thing is to correctly calculate the layout of the frame;
    • Bathroom paneling will allow lighting with modern built-in bulbs. This is necessary if your bathroom has a low ceiling. Additional lighting, as an option, can be put on the walls.

    Installing plastic panels in the bathroom in a frame manner also has disadvantages. There are not so many of them, but it is necessary to take them into account:

    • The frame is most often made from metal profiles. And, naturally, they require a certain place. Let not much, but the space of the bathroom itself will be reduced;
    • The frame itself, in principle, cannot look like an integral structure. Some of its plastic parts can be damaged unintentionally;
    • The cladding of the bathroom with plastic panels with frames creates an empty space between the bathroom wall and the panels. This means that the plating of the bathtub with plastic panels will settle various undesirable microorganisms. Even in this space, whatever one may say, moisture will appear, which will be favorable for the reproduction of fungus and ill-fated mold;
    • Finishing a bathroom with plastic with a frame will require special financial costs. Initially, to buy metal profiles.

    Perhaps, to someone, these disadvantages will seem so significant. And how to make panels in the bathroom avoiding these pitfalls? It is worth taking a closer look at another option - paneling without installing a frame base.

    Frame installation

    The bathroom is always in the grip of high humidity. Finishing the bathroom with PVC panels will require surface treatment where the plastic will be glued.

    Installation of plastic panels in the bathroom usually goes like this:

    • Lining a bathroom with plastic panels using a frame solution for wall cladding begins with a high-quality attack of the base for further fastening. The characteristics of the differences should be adhered to as accurately as possible. Ideally, if the differences are equal to three millimeters. No bumps and waves are needed here. But this situation is fixable. Enough to spend in the bathroom plastering work and work hard with the surface putty;
    • Take a good look around the bathroom, especially the corner areas. Rounded corners are found in reinforced concrete structures. To avoid misunderstandings in working with plastic, the rounded corner can be leveled using a puncher;
    • It would be great to completely get rid of the old wall covering. But not everyone wants to bother themselves with this business. If you do decide to make things easier for yourself, look for cracks in the walls, since this is where the previous coating will peel off. These errors can be removed with a chisel and hammer;
    • Finally, work with antiseptics. It is necessary to treat the surface of the walls well. Better to do it not once, but twice. Give preference to a deep penetration antiseptic. It is more convenient to handle walls with a spray gun. In extreme cases - with a brush. By the way, if there is no fungus on your wall, this is not a reason to overlook this point. Antiseptic treatment is required! Imagine that the fungus appears on the surface of the walls after the plastic panels have been glued? Getting rid of it will be simply unrealistic! Is that to disassemble the brand new plastic and make the cladding again;
    • The surface treated with an antiseptic should dry thoroughly. Then we apply a primer to the wall;
    • We determine the level of plastic fasteners in order to decorate the bathroom with plastic panels, and make markings. We recommend using a nylon thread or fishing line. We measure and mark on the surface. These marks must be connected together with a nylon thread;
    • Thus, we got the baseline of the installation. Choosing a certain size, we take into account the thickness of the insulation for the bathroom. Your insulation should not be distorted by plastic sheets. Therefore, it is recommended to provide a margin of two centimeters. This is enough for satisfactory ventilation;
    • Once preparatory stage came to the finish line, the walls must be primed.

    Now you can start fixing the frame.

    Installing the frame for cladding

    So, the bathroom is finished with PVC panels on a frame base. In terms of cost, it is not very expensive, however, the material will create a plane with all the visible flaws. Therefore, the frame must be made perfectly.

    For the execution of the frame, a metal profile is used. It will last much longer than plastic counterparts or timber profiles.

    Important! Let's say you, for some reason, opted for a wooden crate. Then it must first be made and treated with an antiseptic.

    The installation of the frame is done as follows:

    • We cut the frame parts to the required size and hook them according to the markings. Use self-tapping screws (you will have to buy them additionally) and dowels. We punch the cutouts with a puncher;
    • The next step is the placement of the crossbars. They must be placed on the same plane. In order not to be mistaken, it is worth strengthening the nylon thread along the diagonals of the crate. We will align the level of the fastener height along it. We also calculate the gap between the slats according to the insulation and depending on the parameters of the length of the plastic sheet;
    • Once the frame is installed, we fix the vapor barrier. Of course, it can also be made under the frame. This is much more difficult. And in our case, the material is attached to the slats with a stapler (it is, like other tools, in hardware stores). The vapor barrier should not be done closely, it is better - an overlap of about five centimeters;
    • Install insulation before finishing the bathroom with plastic panels. Recall that it cannot be deformed, but the styling itself must be dense. For fastening the insulation, special dowels are used.

    What is wiring and how to do it?

    Decorating bathrooms with plastic panels is accompanied by such a concept as "wiring". This is the process of determining the place and form lighting fixtures... For example, we make sockets and lamps, which are popular as decoration for mirrors.

    First, we define the connection point. The distributor box will be installed here. If you want to use energy-saving lamps, you will need to make a step-down transformer and a special mount in the junction box. To properly connect all the wires, use.

    Important! Avoid twisting the wires as this may cause short circuits. In addition, the bathroom is constantly humid.

    Installation of panels on the crate

    The final chord is the fastening of plastic panels in the bathroom to the finished frame. The installation of panels in the bathroom starts from the corner areas of the room. Fasten the first panel especially carefully. To be more precise, it must first of all be put correctly. After all, it is along it in the future that the fasteners of the subsequent elements will flow. Installation of plastic panels in the bathroom is done perpendicular to the floor.

    The subsequent panel is attached to the groove of the first. And the second shoulder is combined with the frame using a construction stapler. The required holes are made with a drill.

    The last panel will most likely not fit in the width. It is worth attaching it and making notes. We make a cut of the plastic with a fine-toothed hacksaw.

    Once the plastic paneling of the bathroom is complete, nail in the skirting boards. So the cladding will hide the joints of the panel walls with the ceiling.

    How to decorate a bathroom with plastic without a frame?

    How to sheathe a bathroom with plastic without fastening the frame base? Decorating a bathroom with plastic without a frame with your own hands is within the power of any person. This is already a less popular cladding method. It seems that fewer actions should attract the builder. But perfectly flat walls are extremely rare. If you decide to sheathe the bathtub with plastic panels without installing a frame, then you initially need to level the surface of the wall.

    Frameless cladding has a number of significant disadvantages:

    • You will spend too much time and money to prepare the wall surface;
    • How to sheathe a bathroom with plastic panels, adding more lights? Just forget about recessed lights! Only external devices will have to be used;
    • Installation of PVC panels in a bathroom without a crate suggests the impossibility of installing insulation. And this is important.

    If the surface in the room is ready, then the installation itself can be started. By the way, before finishing the bathtub with plastic panels, it is worth worrying about such a matter as wiring. It’s too late to think about it after sheathing. It will be necessary to remove the panels again.

    • How to glue the panels in the bathroom? More precisely than? In order for your work to be done with high quality, and the result was sufficiently long-term, professional installers recommend using liquid nails. The use of such an adhesive is very convenient. If we compare liquid nails with a construction gun, then in the latter case, the injection is metered and in insufficient quantities. A standard bottle of liquid nails is enough for an average of five square meters of cladding. If the wall is embossed, PVC paneling of the bathroom will require more glue;
    • It is better to apply the glue to the plastic in small doses. And not quite at the edge of the sheet. When you press on the plastic during the pasting process, the glue will not creep out to the surface and stain the outside;
    • The smeared plastic is applied to the surface of the wall, slightly tapping on it. Then the panel is disconnected to dry for a few minutes;
    • Next, the plastic sheet is carefully attached to its rightful place and tapped again with the palm. I wonder why such machinations? The fact is that pasting with liquid nails dictates exactly this sequence of actions. Otherwise, the likelihood of distortion of the following panels is too high. It is very important to glue the launch pad perfectly. To achieve optimal evenness, you can apply the level already familiar to us;
    • It would be nice to fix the first panel at the top and bottom with any fasteners (you can take self-tapping screws). Don't worry, later the hardware will hide under the skirting board. And hardly anyone will notice them. You can also apply start strips. However, if your bathroom paneling requires skirting boards, then a starter profile is not needed. It is worth noting that the plinth will further strengthen the plastic fasteners.

    To consolidate your knowledge of how to sheathe a bathroom with panels, look at construction sites for photos and videos on the relevant topic. Read reviews from experienced builders that describe all the finishing options.

    How much plastic do you need?

    How to decorate a bathroom with panels, having calculated the required amount of material in advance? To determine the required number of panels, the length of the wall is divided by the width of the plastic strip itself. This is how absolutely all walls are calculated. As for the length of the material, the planks should be clearly larger than the height of the walls. Remove the size of doors and windows from the total number of planks.

    Let's try to calculate the panels. Before finishing the bathtub with PVC panels for the wall 2.5 by 4 meters, we count. The racks will be fastened every 50 centimeters. 4 / 0.5 = 8. Plus one profile per stock. As a result, sheathing will require 9 pieces. The usual profile length is 3 meters. We will cut off the excess.

    The calculation for horizontal profiles is also carried out: 2x (2.5 / 0.5) = 10 pieces. Horizontal profiles are also attached approximately every 40-50 centimeters. Don't cut all the profiles in advance! We check each profile separately. The fact is that the ceiling height is often different in different places.

    With such minimal knowledge, you can easily sheathe the bathroom with plastic panels with your own hands. And also tell relatives and friends how to glue panels in the bathroom. The main thing is not to rush!

    You can also use our calculator for ceramic tiles, it is also suitable for calculating panels.

    Cladding with PVC panels is a fairly popular option for decorating a bathroom. The use of this material is not only rational in terms of costs, such repairs are practical during subsequent operation. The sheathed surface can have different textures, there is a large selection in hardware stores. This method is great for completing the interior design of a room with a high level of humidity.

    When purchasing a PVC covering, pay attention to the following parameters:

    • The degree of evenness of the surface (there should be no drops);
    • The number of ribs that determine the rigidity of the cladding elements;
    • Impact resistance of products;
    • The quality of the decorative coating;
    • Plastic wall covering design.

    It is important that the color of the finishing elements matches each other. Buy bathroom cladding material from the same batch to avoid discoloration.

    If the cost of products is too low, such an indicator may indicate poor quality of the material. Such panels are susceptible to decay and deform during operation.


    In the bathroom, it is better to use finishes, the relief of which is not very pronounced. The volumetric texture of the surface can provoke the development of fungus and mold. If there are significant depressions, such coatings are difficult to keep clean.

    2. Main characteristics of PVC

    Pros of PVC for the bathroom:

    • Saving repair costs.

      The average price for PVC of standard dimensions is 200 rubles / piece. The cost of the material varies in the range of 100-500 rubles / piece. The price level directly depends on the design of the finishing elements and the quality of the material.

    • Compliance with sanitary and hygienic standards.
      PVC has a low odor absorption capacity. Cleaning the surface does not require a significant investment of time and effort. For surface treatment, you need a soapy solution and a foam sponge;
    • High degree of moisture resistance.
      This characteristic allows you to use the material for the arrangement of premises in which the humidity values ​​are exceeded;
    • Simple implementation of the idea.
      For cladding, no specific experience with the material is required. High-quality cladding of the room will work if there is a minimum skill in working with a screwdriver and a construction stapler;
    • The necessary communications can be placed under the finishing.
      This option is possible if you pre-mount the duct for the pipe system.
    • Low degree of flammability.
      Wet areas are prone to short circuits in the wiring. The plastic sheeting can only melt when exposed to fire, but it does not spread fire.
    • High quality heat and sound insulation.
      These properties, as a rule, are indicated by the manufacturers. Such parameters have almost no real value.

    Minuses:

    • Low level of environmental friendliness;
    • PVC is considered quite fragile.

      During the preparation of the elements, excessive pressure can cause cracks in the coating;

    • The cheapest options for PVC panels emit a pungent smell of phenol into the space, the effect of which is undesirable for the human body;
    • The thickness of the cladding reduces the area of ​​the bathroom. This circumstance is essential for small rooms;
    • The design level is inferior to ceramics.

    Before buying, it is necessary to present the design of the room and focus on a specific idea, taking into account the characteristics of the room.

    • For a small bathroom, it is appropriate to opt for shades of light colors, thus, the visual volume of the room will increase;
    • An interesting solution is the arrangement of plastic panels of different sizes and designs. For example, you can combine contrasting tones;
    • The wooden texture will allow you to equip the room in the ethno style;
    • Do not combine PVC cladding with expensive materials such as marble. In this case, the interior will turn out to be tasteless;
    • If you wish, you can choose. Thus, the decoration of the bathroom can be done in the classic version or neoclassic - with columns, friezes and borders;
    • Photo printing allows you to create an individual design, thanks to modern technologies applying paint;
    • Sheathed walls go well with ceiling covering from rails.

    Natural texture in the bathroom interior

    Photo printing on polyvinyl chloride

    Mosaic pattern on plastic panels

    Black and white bathroom design

    Ceiling part of the bathroom made of plastic elements

    4. Installation of PVC panels

    The cladding technology is considered quite simple. Two methods are used to install the elements: frame and frameless.

    1. Frame option

    Fixation methods:

    • On self-tapping screws.
      The advantage of this option: the evenness of the walls is not important.
      Disadvantage: a wooden frame is required (additional time for preparing the timber).
      To shorten the installation time, you will need a screwdriver.
    • On clamps - optimal way installation (metal profiles at the base of the frame).
      Advantages of the method: the fasteners are easy to fix on the crate frame, with the help of clamps, a coating is created that is well fixed, it does not take much time to dismantle.

    2. Frameless method

    Fastening is carried out using special glue("Liquid nails", "Moment-montage"). Suitable for the most flat surfaces.

    Advantages:

    • The likelihood of PVC punching and the need to replace elements damaged during the installation process is excluded;
    • The arrangement of panels without a frame takes much less space... This fact often has great importance in the bathroom space;
    • There is no need for additional costs for the elements of the frame fasteners, special metal profiles, etc.;
    • In contrast to the frame installation, in this case there is no space for the development of harmful microorganisms.

    Disadvantages:

    • there is no way to replace a separate element that is damaged during operation;
    • it is quite difficult to dismantle the finishing material.

    The bathroom is the most visited room in the house. This functional unit gives the home harmony and comfort. Renovation in the bathroom should be approached as responsibly as possible. There are many materials that can be used to decorate this room. However, they are chosen taking into account the budget and the characteristics of the interior of the home as a whole.

    During the renovation process, it is important to take care of replacing outdated plumbing fixtures, wall and floor cladding. The problems are quite significant. If the choice of plumbing is better left to professionals, then surface cladding can be chosen independently. Bathroom decoration with plastic panels - perfect solution for an apartment and a private house.

    Pros and cons of PVC panels

    Plastic panels offered on the modern market are a relatively new material that has been massively used in the decoration of residential premises. Today it is very popular with both professional builders and those who independently carry out repairs to their homes.



    This finishing method is affordable and economical when compared to tiles, which are quite expensive. At the same time, plastic panels are very easy to install. The material meets all the necessary standards, despite their large number. The bathroom, unlike other rooms in the house, is constantly damp.

    All items and facing materials are constantly in contact with water or humid air. This leads to their possible susceptibility to deformation and rusting; therefore, materials that are easy and quick to clean are chosen for such premises. Plastic is waterproof, which allows you to install it in bathrooms without the fear of mold and mildew on the walls.

    Plastic panels are made of multilayer PVC. He is synthetic material, which has excellent durability and water-repellent properties. Inside PVC panels have stiffening ribs. On top of them, a special polymer is applied, which increases the strength characteristics of the material, giving the top layer density and smoothness. Plastic panels look attractive and do not get dirty.

    The advantages of PVC panels include:

    • Cheapness. One panel costs no more than 200 rubles. For an ordinary bath in an apartment, you will not need to buy a lot of material. In this case, the quality of the cladding will be quite high.
    • External appeal. The stuff doesn't look cheap. The assortment of many stores includes panels different designs and color shades. It is easy to find decoration material with prints and ornaments. Some models are stylized for natural materials.
    • The material is fireproof and waterproof. It does not corrode and is quite durable.
    • Under the PVC sheathing, it is enough to simply arrange communications - hoses and pipes. It is easy to drill a hole in the material without using a professional tool.
    • PVC panels are distinguished by sound and heat insulation properties. It is very effective to install them together with special spacers that will be placed under the cladding.
    • Such material does not absorb odors and moisture.
    • Plastic panels are environmentally friendly and hypoallergenic.

    All of the above applies only to quality, certified European-made panels. If you want to save money, you can stumble on poor quality product... This will entail an urgent need to change the wall cladding in the bathroom. In addition, low-quality plastic, when heated, begins to exude an unpleasant odor and harmful substances.



    Among the disadvantages of plastic panels are:

    • PVC panels are not resistant to mechanical stress and can be easily deformed. At the same time, low-quality materials can crack and break even under slight pressure.
    • Materials that sell at a low price are considered a discounted item. They may contain toxic compounds that are harmful to health.
    • Since the installation of the panels will require the construction of a frame, this will reduce the already small area of ​​the bathroom.

    If you choose high-quality PVC products, the sheathing will be durable and strong. Therefore, it is not worth saving on such material. Good materials can last for more than a dozen years without losing color or cracking.

    Installation methods

    Many installers use three methods to install plastic panels on bathroom walls. The main selection criterion is the curvature of the surface. If the walls have many ridges and depressions, it is best to pre-treat.

    When the walls of the bathroom are fairly flat and smooth, it is enough to fix the panels with liquid nails. You do not need to create a wireframe.

    Installation of PVC panels on the grid

    To mount the panels on the lattice, you will need to prepare special tools and materials. Their list includes:

    • panels and skirting boards;
    • dowels, screws, profiles and corners that will form the future grille;
    • power tool - jigsaw and screwdriver;
    • silicone sealant and glue.

    It is better to choose plastic profiles. This material is not afraid high humidity, is characterized by optimal strength and lightness. If metal is chosen for the installation of PVC panels, stainless elements should be used. Galvanizing is also suitable for this purpose. It is not recommended to set the tree as profiles. If this material is nevertheless chosen, it must be treated with linseed oil and fixers.

    Between the ribs of the frame, a distance is left that is optimal for the installation of the selected panels. The average is half a meter for the walls and 40 cm for the ceiling. Fasten the ribs using self-tapping screws or dowels. It depends on the material of the floor. The corners with guide profiles are fixed in the same way. At the same time, the space turns into a solid frame, which is able to smooth out the joints between the panels.



    Installation process:

    • The panels are aligned and positioned so that a 3 mm gap remains from the ceiling and floor. Thanks to this, fresh air will penetrate behind the panels, eliminating the development of mold.
    • The elements are connected to each other using locks. You will hear a click when the panels are successfully locked. The material is attached to the profile with self-tapping screws. Then the joints of the panels are treated with a sealant.

    PVC panels are planted and fixed on the profile only with the wide side of the lock. There are no other options. In other positions, the screws will interfere.

    Installation on a frame

    The frame method of installation resembles the method of fastening panels to rails. In front of it, you also do not need to level the walls. The frame is created from metal profiles that are used to install drywall. The advantage of the frame is the ability to hide defects in the base and communication networks.

    There should be no more than 30-40 cm between the frame strips. They should be perpendicular to the direction of the panels. It is better to build such structures in bathrooms that have a normal microclimate, without significant hesitation.

    Before installation, it is important to decide on the fastening elements:

    • Nails - This method is reliable, however it will not be possible to reuse the panels if selected. In this case, the integrity of the product is violated.
    • With staples, using a stapler. Staples fix inner part groove to the rail.
    • Self-tapping screws.

    When choosing metal profiles used for fixing the gypsum board, it should be taken into account that the room will become smaller. The profiles are installed as in the previous version. The profile is fixed to the wall using U-shaped fasteners. This allows you to adjust the flatness of the surface.

    After installing the profile, the installation of the fittings begins. A plinth is installed on the upper profile. Assemble the panels, fixing them through the "tongue-and-groove" system. They are attached to the profile with self-tapping screws. These elements are optimal for the installation of plastic plates.

    On liquid nails

    When installing the panels with glue, you will need a spatula. In advance, you should prepare a sealant and materials that will be needed for the frames of the boxes for communications. The walls should be cleaned in advance. One of the main conditions is the absence of whitewashing. For this, it is recommended to wash the wall with soap.



    Using a spatula, spread the glue evenly over the panel and press it against the wall. Hold the plate in the pressed position for 2 minutes. Spacers are used for this purpose. The glue should harden. Tiled boxes on small frames are installed under pipes and wires. A ventilation gap is created at the ceiling and floor. It should be up to 3 mm wide. This is sufficient for air access.

    bouw.ru

    Why are plastic panels better than other materials?

    The most popular material for finishing rooms with high humidity is ceramic tiles, which have a whole range of advantages. However, pvc panels have also won the love of homeowners, and it's not just their low price (although the cost is sometimes a decisive factor).

    According to the reviews of master finishers and owners of bathrooms, plastic is distinguished by the following positive characteristics:

    • It is very easy to work with him. On the one hand, this is literally a light material with convenient dimensions (for decorating the walls of a small bathroom, a few parts are enough - 4-5 pieces 30 cm wide on each side), on the other, the methods of fastening elements to the wall and the ceiling.

    • Easy care after installation. White gloss, matte colored surface and decorative print can be washed well with ordinary soapy water, without the use of special products.
    • Plastic does not absorb water, retains its structure for many years, therefore, it is an unsuitable soil for the spread of fungus or mold.
    • PVC does not burn, but in the event of a fire it emits caustic smoke that is harmful to health, therefore, special attention should be paid to the quality of electrical cables and the correct installation of the lighting system.

    And one more advantage that ceramics does not have is that it is easy to hide communications and repair errors behind plastic, and at any time you can quickly disassemble the structure, replace pipes or wiring, and then reinstall the panels.

    There are also disadvantages, and they must be taken into account during the repair. The main disadvantage is that the installation of panels "steals" living space, so when calculating the area, do not forget to subtract the thickness of the panel itself and the width of the profiles on which it is held.

    The next disadvantage is insufficient strength, on soft plastic it is easy to leave a scratch with a cutting object. And beware of the cheapest products, which can be recognized even by their smell - they exude phenol, which is not just unpleasant, but also harmful to health.

    Wall decoration with plastic - 2 popular options

    There are several ways of attaching plastic panels to the wall, they all have distinctive features... We will consider two ways that even novice builders can master:

    • fastening panels to a wooden or plastic crate;
    • gluing plastic parts to the wall with liquid nails or glue.

    For gluing, additional leveling of the wall surface is required, the first method can be applied to completely unprepared walls.

    Method # 1 - attaching panels to the crate

    Whichever method you prefer, the first step is to prepare the tool and walls. The tool is used the same:

    • for marking - tape measure, level, pencil, square;
    • for trimming - fine-toothed hacksaw, construction knife;
    • for drilling holes - perforator;
    • for fastening - a screwdriver, screwdriver, clips, screws or dowels.

    Materials must also be purchased in advance in the required quantity.

    Many people prefer to decorate the bathroom standard panels pvc - ordinary white glossy or matte products, but the range of modern products is so wide that you can choose a more interesting option: pearl or ash shades, with gilding or silver ornaments, floral patterns or artistic panels.


    In addition to the panels, you will need a profile - sales consultants will advise the best option - as well as a silicone sealant. If the crate is wooden, then 10x30mm slats and an antiseptic are needed.

    Wall preparation consists in removing old coatings and dust and in additional treatment from mold, especially if the foci have already been found on the walls or ceiling. You also need to close up large gaps or potholes, but you do not need to align - the frame from the profile will hide the curvature.

    The markup stage cannot be skipped, as it guarantees correct location all parts are relative to each other. To avoid distortions, we use a laser level.

    If we plan to sheathe the surface of all walls, draw horizontal lines at a distance of 1-2 cm from the floor and ceiling - the outer rows of the crate will be attached here. Then we draw the same lines vertically - along the line of the corners.

    Next, we mark the entire wall surface from bottom to top, placing or marking markers-beacons with an interval of 40-50 cm. We connect them with lines and get several horizontal lines, which we will be guided by when attaching the profile and panels.

    Exactly along the marked lines, using a puncher, we prepare holes for dowels. We apply the slats at a distance of 50 cm and alternately fix them parallel to each other.

    At this stage, we carry out all the work related to communications: if necessary, we replace or repair pipes, lay the wiring, mark the attachment points for wall lamps, sockets or switches.

    Then we install the corners - we fix them in all involved corners, and already we insert plastic panels - lamellas into them.

    Before fixing, we cut each part to length. The standard length of the panels is 3 m, the height of the walls in typical apartments is 2.5-2.7 m, that is, each detail of the vertical cladding must be shortened by a few centimeters.

    If the cladding is horizontal, we trim it based on the dimensions of the walls. We insert the first product into the corner, press it, the second into the fastening groove of the first panel, etc., along the width of the entire wall.

    The final stage remains - masking the end protrusions, extreme slots, and gaps between the panels. It takes place with the help of thin plastic moldings of various shapes.

    Having finished finishing the bathroom walls with pvc panels, we install lamps, sockets, fix shelves, hooks and towel holders.

    Method # 2 - mounting panels on liquid nails or glue

    The glue method is much easier than the previous one, but with one condition - if the walls of the bathroom are perfectly flat and smooth. If this condition is not met, you simply do not technically fix the panels: they will bend, lie down crookedly and not coincide with the connecting grooves. Therefore, if you are unlucky with the walls (and most often it happens), you need to plaster or clad in another way - frame.

    Let's choose the option with perfectly flat walls. In order for the panels to lay down beautifully and firmly, you need to choose the right glue. There are several types of adhesives made specifically for fixing pvc panels. Usually, instructions for their use are applied to the tubes with glue, but sometimes some points of the instructions raise additional questions, so we will consider the whole process.

    Now about the choice of glue. So far, nothing has been invented better than liquid nails, so we buy a tube (or several, depending on the area of ​​the walls), not forgetting to check whether the composition is suitable for gluing plastic.

    You can buy heavy-duty glue that instantly hardens and is able to hold even heavy structures, for example, Heavy-Duty Prodjects DAP heavy-duty (USA) costing only 200 rubles. Liquid Nails (USA) has approximately the same properties on latex base, but its cost is slightly lower - 180 rubles. Titebond universal rubber liquid nails for 260 rubles are able to hold even wet or frozen panels glued to cement, brick, gypsum and other surfaces.

    Installation instructions for plastic panels on liquid nails:

    • Surface preparation - removal greasy stains, dust.
    • Primer required for better adhesion. Primers should match the adhesive, ideally from the same manufacturer.
    • Trimming panels, corners, skirting boards, curbs up to the right sizes(this can be done while the primer is drying).
    • Alternate gluing of panels with simultaneous connection of locking edges.

    It would seem that everything is simple, but each point has its own tricks. For example, the gluing process itself is a two-step process. First, we apply glue to the seamy side of the panel in a checkerboard pattern, in large drops, and press it against the wall with pressure. Then we tear it off (according to technology) and hold it for some time to weather it. After 5-7 minutes, we glue the parts again, with pressure and tapping on the edges, already finally. To save time, we glue several panels one after the other, then tear off several panels as well.

    Pruning also requires special care. Skirting boards, moldings and borders have a small width, so flaws in the trim will be more clearly visible. If you are mistaken by 1-2 mm, no one will notice the defect, so it will disappear under the baseboard.

    Watch the video to see how easy it is to do this:

    We make a ceiling from pvc panels

    Suspended plastic ceiling in the bathroom is one of the best options, therefore, we present to your attention a brief instruction on its installation.

    So let's start with preparatory work... These include purchasing the necessary material and cleaning the ceiling from which the old covering must be removed. For preventive purposes, the entire surface must be impregnated with an antiseptic, even if mold has not previously appeared in the bathroom. From the material you will need a metal profile, suspensions, fasteners for the frame and panels.

    Next, we carry out the installation of the frame. First, we fix a galvanized metal profile (more reliable than wooden blanks) to the ceiling at a distance of 50 cm from each other, then suspensions at 60 cm intervals. The suspensions protect the panels from sagging and ensure the stability of the structure.

    This is followed by the very fastening of the pvc panels. We cut the parts to the width or length of the bathroom (they will be mounted perpendicular to the profile), remove the film, clean the edges.

    Following the first, we mount the rest of the panels - until the last one, which may have to be cut. The panels are fastened together with a lock connection.

    There are other ways of installing a plastic ceiling, but this one is considered the most practical and rational.

    As you can see, to decorate a bathroom with decorative plastic panels with your own hands, you need basic skills in owning a tool and a little free time. A couple of days off - and your bathroom will be unrecognizable!

    vannapedia.ru

    Bathroom decoration with plastic panels

    In what cases is it justified to decorate the bathroom with plastic panels? Which panels are best for you? How to cut and fasten them? In our article we will try to answer these questions in as much detail as possible.

    What is good and what is bad

    First, let's find out if the bathroom can be finished with plastic panels. To do this, it is worth remembering the key properties of this finishing material:

    • PVC is resistant to high humidity and hygroscopic(ability to absorb water) tending to zero. This is a clear plus;
    • It is chemically stable over the full range of bath temperatures. Therefore, there is no need to be afraid of the harmful substances emitted by the finish;
    • Due to the honeycomb structure, the panels have very limited strength. A moderate impact or strong pressure can wash out the front surface, or even completely break the panel;
    • The tongue-and-groove locks do not have tightness after connection. Water can enter the finish. The result will be the guaranteed appearance of fungus and accelerated destruction of the wall.

    conclusions

    You can use plastic panels for finishing a bathroom, but with a number of restrictions:

    1. Wall cladding panels are appropriate as a false ceiling material;
    1. The panels can be used when decorating walls at a height of 1.5 meters - that is, where the likelihood of mechanical stress is minimal. Decorating the lower part of the walls is not strictly prohibited, but it cannot be recommended with a light heart;
    2. It's a good idea to use this material to assemble a box that hides the risers and water supply lines;
    3. It is strictly forbidden to cover the wall above the bathroom, in the shower stall and above the washbasin with plastic panels. In this case, the appearance of mold is guaranteed. The author had the misfortune to be convinced of this personally.

    Materials and prices

    What do we need to finish the bathroom?

    Material Price
    Panels From 160 rub / m2
    Start profile From 8 rub / m.
    Corner profile (external and internal) From 11 rubles / m.
    Foam ceiling skirting board From 8 rubles / m.
    Galvanized profile CD 60x27 mm From 70 rubles / 3 m
    Galvanized straight hanger From 2 rub / pc
    Dowel screw 60x6 mm From 50 kopecks / pc
    Plastic crate for PVC panels From 40 rubles / 3 m
    Claymer for PVC panels From 50 kopecks / pc
    Self-tapping screw for metal 9x3.5 From 20 kopecks / pc

    Bathroom decoration with plastic panels is carried out:

    • On the ceiling - along the galvanized CD profile on straight hangers. Such a lathing allows you to compensate for surface irregularities typical for houses with slab floors and place them above false ceiling lamps with wiring;
    • On the walls - on a plastic lathing with fastening clamps. The wooden lathing is not used in the bathroom: with constant fluctuations in humidity, the tree will inevitably deform. Fixing the panels with adhesive will reduce the maintainability of the finish to zero.

    Styrofoam ceiling skirting board compares favorably with plastic skirting board and starter profile in that it allows installation on curved walls. Minor gaps between it and the wall can be easily eliminated with putty.

    Wall panels below 1.5 meters should be as strong as possible. A simple test will help you assess the strength: squeeze the corner of the panel with two fingers. The honeycomb inside the product should not wrinkle.

    Do not choose panels with highlighted seams and imitating wood texture. Believe me, they look extremely unattractive on the walls.

    A glossy surface is preferable to a matte one: it is less dirty and easier to clean.

    For the ceiling, it is better to prefer white glossy panels with a maximum width (usually 37 cm). The minimum number of joints will improve appearance surface.

    Please note that on sale you can find products in lengths of 2.7, 3 and 6 meters. The closer the panel is to the height or length of the ceiling, the less waste will be left after finishing work.

    Mounting

    The cost of finishing the bathroom with plastic panels is 8-12 thousand rubles, depending on the area, the number of corners and some other factors. Moreover, the cost of materials is often significantly less than this amount.

    For example, with a price per square meter of 250 rubles (including profiles, suspensions and other auxiliary materials) and a room size of 2x2.5x2.7 meters, the cost of finishing a bathroom with plastic panels will be slightly more than 7,000 rubles. Obviously, it is better to decorate the bathroom with your own hands.

    Ceiling

    1. The position of the profiles is marked on the ceiling in increments of no more than 50 cm. With a larger step, the plastic may sag over time. The extreme profiles should be no more than 10 centimeters from the wall;
    2. Along the axes of the profiles, straight suspensions are attached to the ceiling with a step of 0.8 - 1 meter;
    3. By level, the extreme profiles are attached to the suspensions. The ears of the suspensions are attracted to them with self-tapping screws for metal, after which they are bent;

    Please note: the screwdriver will not fit between the edge profile and the wall. Having marked the mount, bend the ear of the suspension closest to the wall and pull it to the profile set on the edge; then align the profile and pull the hanger on the other side.

    1. Pull a couple of threads between the extreme profiles and use them as a guide when installing the rest of the sheathing;
    2. Fasten the first panel perpendicular to the batten with the same self-tapping screws. It is screwed directly near the wall (screws will hide the plinth) and through the ridge of the lock;
    3. Mount the following panels, securing only the ridge;
    4. Cut the last panel to the width and fasten in the same way as the first.

    Useful: it is most convenient to cut PVC with a grinder with any cutting wheel. Use goggles and a mask: plastic dust settles rather slowly.

    Remember to provide ventilation in the space between the suspended ceiling and the ceiling. Otherwise, after the first flooding by neighbors, the overlap will be affected by the fungus.

    Walls

    How to decorate a bathroom with plastic panels on the walls? And in this case, the work begins with the installation of the lathing on the dowel screws. At a height of more than 1.5 meters, the guides are attached in 0.7 - 0.8 meter increments.

    When decorating walls along the entire height, they must be present:

    • Floor level. The instruction is due to the fact that it is there that the wall will be constantly touched by the feet;
    • At a height of 45 cm, falling on the knees;
    • At a height of 90 centimeters from the floor. There, the wall is touched with hands, hips and buttocks;
    • At a height of 1.5 meters (shoulder level).

    Wall decoration begins with the installation of a corner or starting profile, the edge of which is fixed with a clip (it snaps into the guide). Then a panel is inserted into the corner, its comb is attached in the same way.

    The last panel in the row is cut in place, edged with a starting profile and fixed with glue. For gluing PVC, you can use liquid nails or silicone sealant.

    Skirting board

    The finishing is completed by the installation of the ceiling plinth. It is quite traditional:

    • To trim the plinth to size and in the corners, a miter box and a sharp knife with the thinnest blade are used;
    • It is very convenient to glue the plinth on an acrylic facade putty: its viscosity does not allow the plank to slide down the wall. The putty is applied in narrow strips with a spatula. Instead, liquid nails, sealant, or any all-purpose adhesive can be used;
    • The joints between adjacent strips are rubbed with the same putty. This work is carried out without tools, by hand; excess putty is immediately removed with a damp sponge.

    Conclusion

    As you can see, the technology of finishing the bathroom with panels is not complicated. The video in this article will help the reader learn more about it. We will be grateful for your additions and comments. Good luck!

    stroydvor-rtischevo.rf

    Surface preparation

    There are two ways to install plastic panels in the bathroom: directly to the wall and on a pre-arranged crate. The first method can be used if the walls and corners are perfectly flat and do not require additional finishing. Then the plastic panels are mounted directly on the concrete surface using a special adhesive.

    The surface of the walls in bathrooms and toilets has various flaws and irregularities, in this regard, it is necessary to install a wooden lathing, which is needed to fix plastic panels.

    The lathing is arranged from wooden beams or slats that must be fixed to the surface with respect to the spacing between the elements. If the slats are fixed to the wall, then the distance between them should be a maximum of 40 cm, and for the ceiling - 30 cm. The fastening of the slats should be perpendicular to the panels.

    For the lathing, use 10x30 mm bars or a metal profile. Also, before installing the cross rails, the wall should be marked using the water level, which is necessary to avoid distortions and irregularities. If irregularities have been identified, this can be corrected by using small pieces of wood under the batten. If the lathing is made of bars, then nails are used to fasten it, and if a profile is attached, then it is important to use self-tapping screws.

    Important nuances

    1. It is impossible to install panels where there may be temperature differences above 20 ° C.
    2. The installation of plastic should be carried out if the temperature is not lower than 10 ° C.
    3. If the panels were stored at low temperatures, then they should be unpacked in a warm room after two days.
    4. When installing on a wooden lathing, the gaps between the slats must be filled with thermal insulation material.
    5. If the room is humid, then cuts must be made in the crate to ensure ventilation.
    6. If panels with a pattern are selected and the installation is carried out in a vertical position, then their installation should be started from the left corner and installation to the right one, and monophonic and panels with an ordinary pattern can be installed from any angle.

    As the crate is ready, you can start installing the fittings and guides, they are needed to hide the joints between the panels. With the floor, everything is clear, the joint between the floor surface and the panel will be hidden by the skirting board. To fix the guides, it is enough to use nails or mounting clips, if you have to attach to the profile, then you cannot do without self-tapping screws.

    Panel mounting

    Installing plastic panels in the bathroom is not difficult.

    The cladding must be started from the corners of the room.

    Installation of panels begins after they are adjusted to size and cut with a hacksaw, then they are inserted into the guides, and the side protrusion is fixed to the crate. The second panel should be attached to the first panel with locks. Before thoroughly fixing each of the panels, it is important to check the verticality of the material with a level or plumb line.

    In this sequence, the panels are mounted one after another, thereby moving to the next corner. Usually the last of the panels does not fit the width and has to be cut. For these purposes, you need a knife and a ruler. Since the plastic is easy to cut, it is not difficult to cut the panel, it is important to carefully cut off the unnecessary part.

    In some cases it is necessary to seal the walls, the locking elements are simply processed silicone sealant... It must be applied evenly along the inner joint. Such sealing will protect the walls from moisture and fungal growth.

    After all the panels have been installed, the last step is to seal the internal or external joints. For this, use the appropriate corners. You can also use an F-shaped or starter profile. Floor joints are hidden by baseboards. If skirting boards with an inner box are used, then wiring can be placed there.

    1. If the bathroom is small, then it is better to use light-colored plastic panels for decoration.
    2. In order for the interior to be original and distinguished by a special interior, when facing, you can use panels of different sizes or combine patterns and textures, while combining them evenly. You can use other design options, but this will only depend on the imagination of the owners.
    3. After purchasing the plastic material, it is important that the material sit for a while, this will help to avoid deformation after installation.
    4. It is important to install the first panels from the most visible corner, since solid panels are used first.
    5. Before sheathing a bathroom with plastic, it is necessary to provide for all problem areas, usually in plumbing rooms they are corners.

    Observing all the nuances, the marking should be carried out with special care, the panels should also be cut in place, and in order to provide free access to hard-to-reach places, for example, to meters, it is recommended to install a special panel.

    So, it can be noted that the installation of plastic panels in the bathroom is a good replacement for tiles, since it is much easier to install. tile... It is important to follow the installation instructions and follow all the steps, then all households will be happy with such work.

    One of the low-budget ways to beautify the bathroom is to use plastic, lightweight modern material, varied in design and size. Beautiful panels are also suitable for those who decided to quickly put the room in order, since a professional needs no more than 1-2 days to work.

    The process is so simple that decorating the bathroom with plastic panels is suitable even for beginners; moreover, some fastening methods do not require prior leveling of the walls.

    The most popular material for finishing rooms with high humidity is ceramic tiles, which have a whole range of advantages. However, pvc panels have also won the love of homeowners, and it's not just their low price (although the cost is sometimes a decisive factor).

    From a design point of view, correctly selected plastic panels in the bathroom look just as good. ceramic tiles, Venetian plaster or artificial stone

    According to the reviews of master finishers and owners of bathrooms, plastic is distinguished by the following positive characteristics:

    • It is very easy to work with him. On the one hand, this is literally a light material with convenient dimensions (for decorating the walls of a small bathroom, a few parts are enough - 4-5 pieces 30 cm wide on each side), on the other, the methods of fastening elements to the wall and the ceiling.
    • Easy care after installation. White gloss, matte colored surface and decorative print can be washed well with ordinary soapy water, without the use of special products.
    • Plastic does not absorb water, retains its structure for many years, therefore, it is an unsuitable soil for the spread of fungus or mold.
    • PVC does not burn, but in the event of a fire it emits caustic smoke that is harmful to health, therefore, special attention should be paid to the quality of electrical cables and the correct installation of the lighting system.

    And one more advantage that ceramics does not have is that it is easy to hide communications and repair errors behind plastic, and at any time you can quickly disassemble the structure, replace pipes or wiring, and then reinstall the panels.

    If the parts are not glued, but fixed on the profile, they can be replaced at any time with new ones - this is necessary when one of the panels becomes unusable or an interior change is planned

    There are also disadvantages, and they must be taken into account during the repair. The main disadvantage is that the installation of panels "steals" living space, so when calculating the area, do not forget to subtract the thickness of the panel itself and the width of the profiles on which it is held.

    The next disadvantage is insufficient strength, on soft plastic it is easy to leave a scratch with a cutting object. And beware of the cheapest products, which can be recognized even by their smell - they exude phenol, which is not just unpleasant, but also harmful to health.

    Comparative table of characteristics of inexpensive pvc panels made in China and European counterparts, according to which you can judge the quality of products

    Wall decoration with plastic - 2 popular options

    There are several ways of attaching plastic panels to the wall, all of which have distinctive features. We will consider two ways that even novice builders can master:

    • fastening panels to a wooden or plastic crate;
    • gluing plastic parts to the wall with liquid nails or glue.

    For gluing, additional leveling of the wall surface is required, the first method can be applied to completely unprepared walls.

    Method # 1 - attaching panels to the crate

    Whichever method you prefer, the first step is to prepare the tool and walls. The tool is used the same:

    • for marking - tape measure, level, pencil, square;
    • for trimming - fine-toothed hacksaw, construction knife;
    • for drilling holes - perforator;
    • for fastening - a screwdriver, screwdriver, clips, screws or dowels.

    Materials must also be purchased in advance in the required quantity.

    If you have chosen decorative panels with a pattern for wall cladding, try to correctly calculate their number and buy with a small margin, since if necessary, it will be difficult to find similar ones in the future.

    Many people prefer standard pvc panels for bathroom decoration - ordinary white glossy or matte products, but the range of modern products is so wide that you can choose a more interesting option: pearl or ash shades, with gilding or silver ornaments, floral patterns or art panels.

    In addition to the panels, you will need a profile - sales consultants will advise the best option - as well as a silicone sealant. If the crate is wooden, then 10x30mm slats and an antiseptic are needed.

    Antifungal impregnation is required - without it, the wood will not only swell, but also become covered with mold, which will quickly spread to other surfaces.

    Wall preparation consists in removing old coatings and dust and in additional treatment from mold, especially if the foci have already been found on the walls or ceiling. You also need to close up large gaps or potholes, but you do not need to align - the frame from the profile will hide the curvature.

    If you need additional insulation, under the crate, in addition to pipes and wiring, you can hide insulation, for example, ISOVER rolled rock wool

    The marking stage cannot be skipped, as it guarantees the correct positioning of all parts relative to each other. To avoid distortions, we use a laser level.

    If we plan to sheathe the surface of all walls, draw horizontal lines at a distance of 1-2 cm from the floor and ceiling - the outer rows of the crate will be attached here. Then we draw the same lines vertically - along the line of the corners.

    Next, we mark the entire wall surface from bottom to top, placing or marking markers-beacons with an interval of 40-50 cm. We connect them with lines and get several horizontal lines, which we will be guided by when attaching the profile and panels.

    The horizontal lathing is a frame for vertically positioned panels that are fastened perpendicular to the profile. If you need horizontal cladding, mount the vertical crate in the same way - in steps of 40-50 cm, but not from top to bottom, but from corner to corner

    Exactly along the marked lines, using a puncher, we prepare holes for dowels. We apply the slats at a distance of 50 cm and alternately fix them parallel to each other.

    At this stage, we carry out all the work related to communications: if necessary, we replace or repair pipes, lay the wiring, mark the attachment points for wall lamps, sockets or switches.

    We fix the profile or wooden slats on the wall area intended for cladding with pvc panels. If the walls are not completely covered, we also fix the boundary strips at the edges.

    Then we install the corners - we fix them in all involved corners, and already we insert plastic panels - lamellas into them.

    We fix the first part in the center, that is, in the corner farthest from the doors, which is the first one that catches the eye when we go into the bathroom

    Before fixing, we cut each part to length. The standard length of the panels is 3 m, the height of the walls in typical apartments is 2.5-2.7 m, that is, each detail of the vertical cladding must be shortened by a few centimeters.

    If the cladding is horizontal, we trim it based on the dimensions of the walls. We insert the first product into the corner, press it, the second into the fastening groove of the first panel, etc., along the width of the entire wall.

    The last panel will have to be reduced in width. To do this, we apply it to the wall, mark the cutting line and carefully cut it along the entire length.

    The final stage remains - masking the end protrusions, extreme slots, and gaps between the panels. It takes place with the help of thin plastic moldings of various shapes.

    Decorative moldings allow you to refine the room. A ceiling molding is allowed along the perimeter of the upper part, a plastic plinth is at the bottom, and the coal is neatly covered with corner pieces

    Having finished finishing the bathroom walls with pvc panels, we install lamps, sockets, fix shelves, hooks and towel holders.

    Method # 2 - mounting panels on liquid nails or glue

    The glue method is much easier than the previous one, but with one condition - if the walls of the bathroom are perfectly flat and smooth. If this condition is not met, you simply do not technically fix the panels: they will bend, lie down crookedly and not coincide with the connecting grooves. Therefore, if you are unlucky with the walls (and most often it happens), you need to plaster or clad in another way - frame.

    If the walls are crooked, they will have to be plastered or leveled in some other way (for example, hammered with plywood), and this process is equivalent in cost to laying ceramic tiles.

    Let's choose the option with perfectly flat walls. In order for the panels to lay down beautifully and firmly, you need to choose the right glue. There are several types of adhesives made specifically for fixing pvc panels. Usually, instructions for their use are applied to the tubes with glue, but sometimes some points of the instructions raise additional questions, so we will consider the whole process.

    Now about the choice of glue. So far, nothing has been invented better than liquid nails, so we buy a tube (or several, depending on the area of ​​the walls), not forgetting to check whether the composition is suitable for gluing plastic.

    You can buy heavy-duty glue that instantly hardens and is able to hold even heavy structures, for example, Heavy-Duty Prodjects DAP heavy-duty (USA) costing only 200 rubles. Liquid Nails (USA) on a latex basis has approximately the same properties, but its cost is slightly lower - 180 rubles. Titebond universal rubber liquid nails for 260 rubles are able to hold even wet or frozen panels glued to cement, brick, gypsum and other surfaces.

    In Russian construction market liquid nails Moment Installation are popular at a price of 220-250 rubles per tube. They do not lose their properties at high humidity and temperature extremes.

    Installation instructions for plastic panels on liquid nails:

    • Surface preparation - removal of greasy stains, dust.
    • Primer required for better adhesion. Primers should match the adhesive, ideally from the same manufacturer.
    • Trim panels, corners, skirting boards, curbs to the desired size (this can be done while the primer is drying).
    • Alternate gluing of panels with simultaneous connection of locking edges.

    It would seem that everything is simple, but each point has its own tricks. For example, the gluing process itself is a two-step process. First, we apply glue to the seamy side of the panel in a checkerboard pattern, in large drops, and press it against the wall with pressure. Then we tear it off (according to technology) and hold it for some time to weather it. After 5-7 minutes, we glue the parts again, with pressure and tapping on the edges, already finally. To save time, we glue several panels one after the other, then tear off several panels as well.

    One of the options for applying glue is with a dotted line, but there are other ways: checkerboard, zigzag, stripes, spirals. The size of the drops depends on the weight of the panel - the heavier the product, the larger the drop of glue

    Pruning also requires special care. Skirting boards, moldings and borders have a small width, so flaws in the trim will be more clearly visible. If you are mistaken by 1-2 mm, no one will notice the defect, so it will disappear under the baseboard.

    When the process of cladding with pvc panels is finished, it is difficult to say in what way they are fixed. However, when choosing an adhesive method, you will get a few centimeters of additional area, which is sometimes very important for cramped bathrooms.

    Watch the video to see how easy it is to do this:

    We make a ceiling from pvc panels

    A suspended plastic ceiling in the bathroom is one of the best options, so we present to your attention a short instruction on its installation.

    So let's start with the preparatory work. These include purchasing the necessary material and cleaning the ceiling from which the old covering must be removed. For preventive purposes, the entire surface must be impregnated with an antiseptic, even if mold has not previously appeared in the bathroom. From the material you will need a metal profile, suspensions, fasteners for the frame and panels.

    A free space 5-7 cm wide is formed between the ceiling and the suspended structure, which is usually used for laying electrical communications or additional thermal insulation

    Next, we carry out the installation of the frame. First, we fix a galvanized metal profile (more reliable than wooden blanks) to the ceiling at a distance of 50 cm from each other, then suspensions at 60 cm intervals. The suspensions protect the panels from sagging and ensure the stability of the structure.

    When installing a plasterboard ceiling, transverse jumpers are also necessary, but for a lighter plastic structure, longitudinal profiles are sufficient

    This is followed by the very fastening of the pvc panels. We cut the parts to the width or length of the bathroom (they will be mounted perpendicular to the profile), remove the film, clean the edges.

    Insert the first panel with its edge into the starting profile, bend it slightly so that it fits into the opposite profile, and then push it into the side - thus, it is surrounded by a profile on 3 sides

    Following the first, we mount the rest of the panels - until the last one, which may have to be cut. The panels are fastened together with a lock connection.

    If it is planned to install spotlights in the ceiling, you should cut out holes and fix the structures of the lighting devices even before installing the panels.

    There are other ways of installing a plastic ceiling, but this one is considered the most practical and rational.

    As you can see, to decorate a bathroom with decorative plastic panels with your own hands, you need basic skills in owning a tool and a little free time. A couple of days off - and your bathroom will be unrecognizable!

    Decorating the walls and ceiling of the bathroom with plastic panels is considered an excellent alternative to all other cladding options. Plastic is resistant to temperature extremes and moisture, moreover, it is quite convenient to care for.

    Plastic of various colors is available at a cost to each consumer, therefore, wanting to update the design in the bathroom and compare prices different materials for decoration, it is he who is usually preferred. When deciding how to sheathe a bathroom with plastic panels, you should first take care of purchasing necessary tools and, of course, materials. In order to qualitatively transform the bath, you will need, in addition to answering the question of how to sheathe the bathroom with panels, also such material components:

    • the plastic panels themselves;
    • corners and plinths made of plastic;
    • wooden slats, metal or plastic profile;
    • glue, clamps or self-tapping screws;
    • screwdriver;
    • building level;
    • drill or hammer drill;
    • dowel-nails;
    • hacksaw;
    • sealant for reliable protection joints.

    When deciding how to panel a bathroom, it is necessary to immediately determine the method of fastening - self-tapping screws, clamps or glue. Much will depend on this. Each option has its own characteristics:

    • The adhesive fit of the panels will lead to difficulties in the future if it is necessary to dismantle them during repair. Also, this option can only be used with flat walls.
    • Having chosen self-tapping screws, it is worth understanding how to decorate the bathroom with panels and that it will take time to twist them. You can't do without a screwdriver here. It is better to use wooden slats for the frame, having previously treated them with an antiseptic.
    • Can be fastened with clamps. This is the name of the special brackets that wedge into the frame and securely hold the panels.

    Installation of battens in the bathroom

    Wanting to figure out how to decorate a bathtub with plastic panels, you cannot do without a detailed analysis of the process of installing the battens under them. It consists of the following:

    • To create a high-quality lathing, you need to use metal profiles, their plastic counterparts or wooden bars 10x30 mm.
    • Before attaching the slats or profiles, you need to mark the wall.
    • Those who want to figure out how to sheathe a bathroom with panels, the video will tell you the slightest details. For example, such - when mounting the entire frame, first, with a perforator, holes are made in the wall, in which the slats or profile are fastened with dowels. If there are recesses on the surface, it is necessary to put a wooden plate under them.
    • To give the frame rigidity, the first rail or profile is fixed along the floor, then the rest are mounted, retreating half a meter from each. It is also necessary to have a rail or profile where the panels will end - under the ceiling or below, if those who want to figure out how to decorate the bathroom with plastic panels decided to sheathe the walls not to the full height of the room.

    Installation of corners and moldings when facing the bathroom with panels

    Before you decorate the bathroom with plastic panels, you need to perform certain preparatory steps - fix the components. These include moldings, skirting boards and corners. Moldings and corners allow you to neatly hide the corners and joints resulting from installation. First, the starting and corner strips are attached, and then, as the paneling progresses, the remaining components are added.

    To close the transition between the panels and the floor, you will need to fix the floor plinth; the transition to the ceiling is decorated with a ceiling molding.
    Installation of panels and corners in the bathroom, video:

    Fixing panels in the bathroom

    Now let's look at how to decorate a bathroom with panels. The installation of these plastic elements should be started from the farthest front door corner. It is usually most noticeable because it catches the eye immediately. The standard length of plastic lining is 3 m. It is easy to shorten it to the required size with a hacksaw. how to make boxes for pipes.

    Now you should describe in detail how to sheathe the bath with plastic panels:

    • insert the first panel into the molding, fixing it to the crate from the opposite side;
    • subsequent elements are inserted into the previous ones, while you need to press tightly so that there are no gaps, after which you can also fasten them;
    • to equip electrical appliances, it is enough just to cut holes for them, into which to fix the junction box;
    • the last panel rarely fits in width, you have to cut it with a knife;
    • in order to achieve maximum sealing of the joints, it is worth treating the edges with silicone sealant before inserting the panels - this is especially important for the walls adjacent to the bathroom.

    Fixing ceiling panels in the bathroom

    To know how to sheathe the bath with panels, namely the ceiling in it, you should familiarize yourself with performing similar work with the device plasterboard ceilings... The fact is that the installation of the lathing for our case is no different. But the process of installing plastic panels itself has its own nuances. Attached first ceiling plinth, moreover, for docking in the corners, you will need a miter box, which can easily cut off the components at the required angle. Only then can the panels be fastened, acting by analogy with wall mounting.

    Conclusion

    Video: installation of panels in the bathroom on the walls and ceiling: