    It is undoubtedly possible to make a frame house with stove heating, and sometimes it is probably necessary. On this forum, I remember at least one such example - Yuri from BY discussed a wireframe project under construction guest house... There, however, in addition to the stove, there was also a brick internal partition and under the floor there was a concrete screed (both the heat capacity of the house). Yuri is a professional builder, and he probably did some kind of heat engineering calculation.

    What, if very roughly, is the difference, in terms of heating, modern frame house from a log hut (a traditional analogy with a Russian stove)? The frame, if you build according to the norms, is much better insulated, requires much less energy (firewood). But it is much lighter (in grams), it has almost no heat capacity of its own, if it is not added artificially. When you heat the stove in the hut, it heats up and - by radiation and convection - heats up the massive house, and then together they gradually cool down until the next heating. There is nothing to heat in the frame walls, except for a thin interior cladding... Methods for increasing the heat capacity of the frame - concrete slab bases, massive internal partitions, massive interior decoration... The Russian stove and fireplace will also certainly add robustness.

    When I figured out this question for myself, I did approximately the following calculations:

    EXAMPLE. Consider a small frame house, type 6x9, one floor (one stove is unlikely to mean much more heating). It turns out about 200 m2 of enclosing surfaces - two floors and walls. Let's say, for simplicity, that it is insulated with 150mm mineral wool on all sides. Add additional heat loss to windows, doors and ventilation, subtract additional insulation due to internal and exterior decoration, and we will accept without additional calculation, again for simplicity, that such a house requires 60 watts of heating power to maintain the temperature difference inside and outside of one degree. It turns out that in a frost of -40 (like we have tonight), 3.6 kW of heating power is needed (so that it is +20 inside), on an average Moscow winter day - about 1.5 kW. This is the power, multiplying which by time, we get energy in kW * h (or in cubic meters of firewood, taking into account their moisture content and the efficiency of the stove).

    Now let's calculate what the heat capacity of the house should be so that it cools down by no more than 5 gaduses (for example, or how much do you want?) In 12 hours (between the furnaces) on a frosty day, for example, at -30. In such a frost, the house gives off 3 kW, or 36 kW * h in 12 hours. So much energy will give, after cooling by 5 degrees, about 6 tons of water, or about 30 tons of concrete (brick), or about 15 cubic meters of wood. This is how much heat-consuming materials you should have INSIDE THE HEATER, including the stove and the fireplace, so that the house between the fireboxes cools down by no more than 5 degrees. If you have so much, then no problem, you just have to correctly calculate the power of the furnace. And if not, then the house will cool down - and heat up too! - faster. You will have to heat more often with smaller tabs of firewood, which you are unlikely to like)

    Like that. This, of course, is a very rough calculation, and you can (should?) Make it more accurate for your particular case.

    PS For myself, personally, I decided that heating a SMALL frame is both cheaper and safer, and most importantly, it is much more comfortable with electricity. To come several times during the winter to take a sip of romance is one thing, but to drown every day is quite another. IMHO)

    150x150 150x200 200x200 145x145 145x195 195x195

    BASIC EQUIPMENT OF THE HOUSE FOR SHRINKING FROM NATURAL MOISTURE MATERIAL (INCLUDING ASSEMBLY AND DELIVERY):

    • Log house - timber 150x150 mm (1st and 2nd floor).
    • All partitions - timber 100x150 mm (1st and 2nd floor).
    • Raising the walls of the second floor - 1.2 m.
    • Floor and ceiling beams - timber 100x150 mm. (after 59 cm under the size of the insulation).
    • Roof gables - timber 150x150 mm (height 2.6 m).
    • The rafter system is a board 50x150 mm (after 59 cm under the size of the insulation).
    • Roof outlets at least 50 cm.
    • Roof lathing - board 25x150 mm.
    • Roof covering with roofing felt.
    • Treatment of the lower crown and genital lag with an antiseptic.
    • Height of the 1st floor clean - 2.7 m (+/- 5 cm clean from beam to beam).
    • The height of the cleanliness of the 2nd floor is 2.5 m (+/- 5 cm clean from the beam to the ceiling girder).
    • All consumables (wooden dowels, flax fiber (jute), nails, staples, roofing felt).
    • Free delivery in the Moscow region and up to 600 km from our production base.
    • Assembling the walls of the log house on wooden dowels (dowels);
    • Dovetail cutting of corner joints (warm corner)
    • Installation of windows, doors, flooring, stairs and roof insulation are carried out in 6-7 months (after complete shrinkage of the log house) and are not included in the package.
    • Waste collection inside the building and outside in separate heaps.
    Service Description Price
    Strapping bar for pile foundation Serves as a strapping for piles and a support for chafing beams 150x200 18000 rbl
    Sub-floor on the 1st floor Edged board 25x100-150mm 17000 rbl
    Sub-floor on the 2nd floor Edged board 25x100-150mm 17000 rbl
    Additional crown Increasing the height of the log ceilings On request
    Replacement of internal partitions Increase in thickness from 100 to 150 mm On request
    Genital replacement and ceiling beams from 100x150 mm 100x200 mm 1st floor On request
    100x200 mm 2nd floor On request
    Generator rental Provided in the absence of electricity on the site, only gasoline is paid is free
    Construction change house 2x4 In the absence of housing for builders (after construction remains with the customer) RUB 18,000
    Profiled timber "for block house" Rounding off the outer side of a profiled bar of any section. Is free
    Mirroring the project Is free
    changing the project without increasing the material Is free

    Select a construction site on the map and the shipping cost will be calculated automatically

    View dimensions

    View dimensions

    STAGES OF COOPERATION

    First contact.
    We discuss basic issues by phone or e-mail.

    We agree on the construction details on site. It is important for us to know the location of the house on the site and the way to get to it.

    Signing a contract.
    We draw up a transparent contract. Prepayment 1% - 5%.

    Delivery of the house kit to the site, the arrival of the brigade. After unloading, 74% of the cost is paid.

    Building a house.
    The term of construction of a house "for shrinkage" is 14 - 30 days, depending on the object.

    Acceptance and guarantees.
    Signing of the acceptance certificate and payment of the remaining 25%. 3 year warranty.

    Description of the project:

    The project of a 6x8 house with a turnkey boiler room offers to purchase inexpensively construction company"Kostroma Plotnik". Comfortable cabin with with total area 98.2 sq. m will be an ideal option for you both for recreation and for living. A feature of the project is the presence of its own boiler room, thanks to which you can maintain optimal temperature in all rooms.

    To enter the house, a terrace was designed from a 6 by 8 bar, after which there is a hall (12.1 m2). To the right of the hall there is a bathroom and a boiler room, and to the left is a living room (17.0 m2), the area of ​​which has been increased due to the attached bay window. A kitchen-dining room (10.4 m2) is planned next to the living room. On the upper level, two rooms are designed with an area of ​​21.7 m2 each.

    DO YOU HAVE YOUR OWN PRODUCTION?

    Yes, we have our own production. We are engaged in the procurement and production of lumber of any section. We are also directly engaged in felling of log cabins different types("Bowl", "in the paw", shaving a log under a plane, as well as under a scraper).

    HOW LONG HAVE YOU APPEARED ON THE MARKET?

    "KostromaPlotnik" has been working in its field for 5 years and already at the moment has a good reputation for the quality of service, work and material supply.

    WHY CHOOSE YOUR FIRM?

    I want to answer you as the head of the company. We bear a great responsibility for the material supplied by us, its installation. We give a guarantee for houses. We employ only Russians, professionals in their field (which is not at all important). We love to build houses, we love to work and communicate with people. We have optimal prices for the construction of houses. Often times, people only look at the cost of the work, not the quality. I can give an example of a similar situation. Some time ago there was a call from the Customer. He was very upset. He started the first construction - a bathhouse. The customer was looking for a cheap option and found it. The bath was delivered incomplete. Even the workers were not provided for the construction. Although everything was spelled out in the contract. The very quality of the felling was disgusting. Calling the company, he was simply answered: "What you ordered, you get it." After that, the Customer contacted us. He was given a brigade. When they arrived, they were shocked by what they saw. As the saying goes: "I wish these masters to tear off their hands." This is what the undervalued price and attitude to work are all about. Advice for the future, always think over your decision! As for the Customer, my workers have assembled a good bathhouse. A year later, he ordered a good solid house from us.

    Stove heating makes its own adjustments to the architecture of the house - professionals begin designing a building by choosing the type of hearth and the place for its construction. The project of a house with a Russian stove is always different from a project in which the main role is played by a "Swede" or a modern cast-iron convection oven. The main task of the designer is to correctly determine the installation site of the heating device and plan the placement of rooms so that each room is warm and dry.

    Features of the design of housing with stove heating

    Stove heating, which does not have a water circuit, will only be effective if the stove becomes the center of all adjacent premises... To achieve this, the hearth is installed in the wall between the rooms, and the firebox is taken out into the corridor or into the kitchen.

    One hearth for four isolated rooms

    Some architects offer another option for solving the problem - the installation of two or even three hearths in different rooms... However, a central heating unit is preferable to the construction of several heat sources - this allows you to do with one chimney and significantly saves fuel consumption.

    In projects two-story houses with stove heating, they adhere to the same rules, but they necessarily provide for a reliable overlap between floors that can withstand the mass of a brick building. All heavy parts (stove bench, oven, hob) are placed on the ground floor, and at the top they are limited only by the heating shield.

    If the house is planned according to the studio principle and consists of one large room, the Russian stove is made the central link, at the same time entrusting it with the tasks of separating the space. Thus, the hearth can separate the kitchen and living room, sleeping area and common room.

    Russian stove with stove bench in a house with a large living room and bedroom

    Enlarged doorway in the bedroom does not impede air exchange

    Examples of interesting layouts of houses with stove heating

    Considering projects of houses with a stove, it is worth considering not only the size of buildings and layout features, but also the materials used for the construction of buildings. Not all options designed for brick buildings are suitable for wooden structures.

    Small country house with a veranda

    In that not big house one living room with an area of ​​15 sq. meters and a kitchen-dining room with an area of ​​8 sq. meters. The project provides for a small bathroom, the entrance to which is in the kitchen, and an unheated veranda.

    House project with stove heating (building dimensions 5 * 7 meters)

    The heating device is located in the center of the building and heats all internal premises: the kitchen, the room and the bathroom. The firebox is located on the side of the kitchen; here it is recommended to equip a hob and an oven. If the house needs hot water, then the best place for a water tank, the authors of the project consider a bathroom.

    From the side of the living room, it is easy to supplement the stove with a false fireplace, providing a small depression in the wall. A decorative fireplace insert will not only decorate the room, but also increase heat transfer, playing the role of traditional stoves used in the construction of Russian stoves.

    Wooden house with two living rooms and a bathroom

    In that log house two adjacent rooms - a bedroom and a living room with a kitchen-dining room. The hearth in the wall heats all four rooms, including the entrance hall and the bathroom. The couch is brought out into the bedroom, where it serves as a resting place and increases the heat transfer of the heating device, remaining warm for a long time.

    The plan of a hut with a Russian stove

    There is a dryer in the hallway - it is convenient to dry wet shoes and clothes on it. The kitchen has a stove. For the warm season, a summer course is provided, which allows you to use only the stove without using the heating.

    Layout of a house with two bedrooms and a living room

    This home is designed for permanent residence and includes two bedrooms, a living room with a kitchen, a bathroom and a storage room. The stove is in the wall and heats the kitchen-living room and both bedrooms. The bathroom is not heated, but it borders on the hallway, into which one of the stove corners is led out. If a woodburning hearth is the main source of heat, it makes sense to increase its efficiency with air ducts.

    Residential building project with stove heating

    The kitchen is equipped cooking stove and an oven. There is no door in the living room, so the heat is evenly distributed throughout the house. If you plan to build a Russian stove with a stove bench, then it is best to build a trestle bed in one of the bedrooms.

    Brick house project with two ovens

    In a big house for permanent residence in some cases, two separate stoves are installed. This building has two bedrooms, a living room and a separate kitchen. The main reversible heating stove is installed between the living room and the children's room. The furnace door and the building body open into the living room, and the nursery is heated roughly - this arrangement prevents carbon monoxide from entering the children's bedroom.

    A second fireplace with stove and oven is located in the kitchen and heats the adults' bedroom. The design of this model can work in winter and summer - in the warm season, summer dampers are opened, through which hot gases quickly go into the chimney.

    Heat enters the corridor from the kitchen, the room is small, so it is enough to leave open door to provide in the hallway comfortable temperature... There is no heat leakage to the street, since the cold air flow is cut off by the glazed veranda.

    With all the variety of ready-made projects of houses with a stove, we recommend that you contact a specialist and order an individual plan, expressing your wishes. If you choose one of the schemes, you need to show the drawing to a professional, perhaps he will make useful adjustments and advise how to make stove heating as efficient as possible, and the house - comfortable and cozy.

    Video: stove in a home heating system

    The realization of a long-standing dream - to escape from a stuffy, dusty city was the construction of a 6 x 8 frame house. independent implementation of your project.

    Planning project of a frame house 6 x 8

    As usual, before starting what to do, you need to at least in general terms imagine what needs to be done, from what and to what extent. All these questions can be answered. If you decide to do completely on your own, then all the steps will have to be completed by yourself:

    • Layout;
    • Constructive decisions;
    • choice of heating method;
    • do not overlook the electrical wiring and water supply;
    • choice of materials to complete all elements of the house.

    A separate point should be mentioned the approval of the project and obtaining a building permit. But here, as they say, everyone decides for himself to go the official way or to act at his own peril and risk.

    After long reflections on how much space is needed for life, it was decided to stop at the option of a 6 x 8 frame house with an attic. The first floor is a full-fledged residential, the second is an attic. Small architectural excesses - a balcony and a "cuckoo" in a simple gable roof.

    Using the simplest graphic editors you can draw layouts:

    To visualize the concept, it is already necessary to use specialized software. As a rule, it also contains a library from projects frame houses 6 x 8, where you can get any ideas.

    General view of a small 6x8 frame house.

    I took the basis on which frame houses are built in North America and Scandinavia. By design:

    • wall thickness - 15 cm;
    • rafter thickness - 20 cm;
    • overlapping - 15 cm;
    • mineral wool and penoplex are used as insulation.

    Start of construction of a 6x8 frame house. Foundation works

    The best time to start construction is spring. Then the whole warm season is ahead - you can do a lot before the onset of cold weather. But due to a number of circumstances, the work began only in September.

    Since the load from the turnkey frame two-story house 6 x 8 with an attic is small and the soil is not porous (sandy loam), then the choice was stopped on a strip monolithic foundation:

    • laying depth - 50 cm;
    • basement height - 50 cm;
    • tape width - 40 cm.

    For concrete reinforcement, reinforcement with a diameter of 12 mm was used. There are two armored belts in three rods. The connection of the rods was made by tying a knitting wire.

    The formwork for pouring the tape was made of centimeter plywood and 50 x 50 blocks. In total, it took 18m3 of concrete to be poured.

    To ensure the possibility of access of construction equipment to the place of pouring the foundation, the entrance to the site was pre-filled and installed drain pipe in the embankment. I also had to hire a tractor to level the construction site and dig a trench for the foundation.

    The top layer of soil inside the foundation is removed. Geotextile was laid and a layer of expanded clay was laid. Approximately took about 5 m3. The purpose of this operation was to remove rotting organic matter from the underground and warm the ground.

    After complete solidification, the tape is treated with a waterproofing bitumast mastic weighing 21.5 kg. Coating was done by hand with a brush.

    An important nuance - in reality, the consumption of mastic is twice as much as stated.

    According to the instructions, one bucket is enough for 100m / 2. The waterproofing of the basement took almost everything without a trace, although the area there is clearly smaller.

    As the rains were approaching, in order to create more or less bearable conditions for the continuation of the work, we had to buy a used banner and erect some kind of awning over the construction site.

    At the same time, a larch board was purchased for the lining underneath. The foundation had to be a little topped up with cement to bring it to “0”. When the foundation was poured, small differences of up to 2 centimeters in height were obtained.

    On the upper edge of the tape we put Technoelast EPP insulation in 2 layers. On top of it is a lining board. At the final stage, we fasten all this with anchors to the surface of the foundation.

    Everything. The foundation for the construction of a 6 x 8 two-story frame house is ready. Now you can proceed to the implementation of the floor and wall frame directly.

    Erection of the walls of a crooked house 6x8

    Bottom strapping and floor joists are made along the lining board. The section of the boards is 150 x 50. The material is the same larch. All connections of parts are laid with polyethylene foam gaskets.

    The joins of the boards to each other are made using galvanized self-tapping screws 100 x 5 and, if necessary, fixing perforated corners.

    The lower strapping is made of two parallel boards installed at a distance of 10 cm. The boards are connected to each other at the corners of the foundation tape and along its entire length every 1 - 1.5 meters. The space between them is tightly filled with insulation. In terms of strength, such a structure is practically not inferior to a whole bar of similar dimensions or several boards spliced ​​in thickness.

    In order to be able to conveniently and safely work on the logs, OSB boards with a thickness of 18 mm were laid. With the role of the subfloor, as subsequent events showed, they did an excellent job.

    Now it's time to assemble the first wall. The frame is assembled from a pine board 150 x 50. The installation step of the vertical racks is 60 cm. In some places it turned out less - then you will have to cut the insulation lengthwise. To ensure the spatial rigidity of the structure, it is imperative to install jibs. Otherwise, the whole structure can turn out like a house of cards.

    Between bottom strapping and laying Izoplat with the wall of the first floor. This insert will improve the soundproofing properties of the frame.

    The installation of the wall was completed after dark, but very successfully.

    Construction is gradually moving. The awning does its job - protects from the rain. Another wall has been installed. Progress is evident.

    By the end of October, all the walls and internal partitions of the first floor were installed

    A ladder to the next second floor has been completed.

    Materials and components for flexible roofing have been purchased, delivered and stored. The construction of the gable frame begins - a ridge bar is installed.

    The role of the roof is still performed by the banner. Although it is cold, it is dry. As materials are purchased and delivered, they are stored inside the house and under the eaves of the awning.

    The interfloor overlap is made of the same 150 x 50 planks, connected by jumpers. As a result, neat cells were obtained, where mineral wool will be installed later when insulating.

    The frame of gables, internal partitions of the second floor and the rafter system are being built on the sly.

    The cross-section of the rafters is 150 x 50. The installation step is 60 cm. We install jumpers between them every 80 cm. This will subsequently save time and material when insulating the roof. In the resulting cells, it will simply remain to tightly install the insulation mats.

    Roof structure:

    • a windscreen (Corotop film, density 140 g / m2) is laid on top of the rafters;
    • bar 50 x 50;
    • inch crate;
    • plywood 12 mm thick;
    • soft roof (bituminous shingles).

    We finish the roof. Frame house 6 x 8 is gradually taking on a recognizable shape.

    The windows that hindered underfoot finally waited in the wings. To finish all the cases with the roof first of all were installed roof windows... Then came the turn of the windows on the first floor:

    • hall - four windows 1500 x 1500, single-chamber, one swing, two - swing-out;
    • bedroom - one window 1500 x 800, single-chamber, swing-out;
    • bathroom - two windows 1500 x 600 and 500 x 600;
    • porch - 1500 x 600.

    The last were brought and installed the central window and balcony door for the second floor.

    The windows were brought in several times. As they arrived, they were installed.

    It's already cold outside - winter. Purchased for space heating heat gun Artox 5 kW. In order not to heat the street, empty door and window openings have to be temporarily blocked with improvised materials.

    During construction, the doors are made of plywood. After finishing the internal and most of the external finishing, there are already decent

    The project of a 6 x 8 frame house with an attic provides for insulation using Rockwool LightButts mineral wool. Looking ahead, I would like to say that it took about 40 m3 of insulation. This is not so little, and you need to think over the logistics of delivery, placement and use of the material in advance.

    Before installing the insulation inside the frame, you must take care that it does not fall out. For this, from the outside, the entire structure is sheathed with Izoplat. This material simultaneously performs the functions of wind protection, sound insulation and additional thermal insulation.

    The size of the mats is 600 x 800 x 50. Thanks to the predetermined spacing of the posts in the frame, the whole process looks quite simple:

    • we print the packaging;
    • we install the insulation between the support bars in the spacer;
    • if the sizes do not match (unfortunately, it happened, and so) we cut with a construction knife to the desired size.

    The thickness is set by installing the mats close to each other. On the walls - three mats (total thickness 15 cm), roof - four (20 cm).

    A separate story. A comprehensive insulation scheme was used (combined use of foam and mineral wool).

    Floor cake:

    • penoplex 50 mm;
    • mineral wool - 100 mm;
    • vapor barrier Corotop;
    • OSB - 18mm.

    At the initial stage, inch boards were nailed to the lower side of the lag, which served as cranial bars. Penoplex will rest on the formed protrusions.

    Since the material is not afraid of moisture, no insulation is required from the underground side. Penoplex boards are cut to size with a hacksaw and installed between the logs.

    Along the perimeter of sheets and joints, where we had to gain an area from scraps of material, we carry out sealing polyurethane foam... Cut off the congealed excess with a knife. It turns out a continuous heat-insulating layer.

    Lay a layer of mineral wool on top. The principles are still the same - tight installation and stacking with an offset so that the seams do not intersect.

    We cover the surface of the insulation with a vapor barrier. This will help protect it from moisture from the room in the future. At the very end, we spread the Vibrostek strips along the logs and install the OSB back and fix it with self-tapping screws.

    Floor attic floor insulated a little differently:

    • the ceiling of the attic floor is hemmed with Tyvek vapor barrier;
    • the Izoplat plate is fixed;
    • from the side of the attic, 15 cm of Rockwool is placed inside the ceiling;
    • from above, we close the entire layer again with thermal insulation;
    • we lay strips of Vibrostek with a thickness of 4 mm along the logs.

    We lay a draft floor from OSB 18 mm (the ceiling above the bathroom and bath in a two-story frame house 6 x 8 is made of two layers of waterproof plywood 12 mm thick).

    Heating and ventilation of a frame house

    Wireframe projects country houses 6 x 8 necessarily provide for a heating source. And this construction is no exception.

    The main source of heat is a wood-burning fireplace. Gas is not planned yet, you can cook using electricity, and a burning fireplace is just beautiful.

    Under the furnace, even at the stage of foundation work, a small patch was poured, not connected to the main foundation. The dimensions of the base are 1.2 x 1.4 m. The height of the base is comparable to the tape. Half a meter buried in the ground and the same outside.

    Start - the base of the furnace

    The work of the master is getting on well, and the turn of the installation of the combustion chamber and the screen came quickly enough. The door for the fireplace Pisla 510 got relatively cheap for 15 thousand. I managed to find it for the action.

    Gradually, the laying of the fireplace is moving forward. It is a pleasure to observe the work of specialists.

    The future oven has almost grown to overlap. There are no severe frosts yet, which is very encouraging. And it inspires some optimism.

    It so fortunately coincided that the last windows and the first heating coincided. We carry out the first heating. Since the stove still needs to be settled, we heat it without fanaticism - carefully so as not to spoil all the work.

    For three hours of the furnace, the temperature in the room has risen by sensations by 10 - 15 ° С. Considering that the thermal insulation of the house is not yet completely finished, there is no vestibule and instead of front door there is plywood on hinges covered with a blanket, the result is quite decent.

    Now is the time to talk about, in fact, a sealed thermos. If there is no ventilation, then at best the air will be musty and stale. In the worst case, the insulation and wooden elements will begin to damp.

    For the ventilation system, I purchased a Domen Regio recuperator with a capacity of 250 m3 / hour and a set of air ducts. The installation allows, in my opinion, to perform the most important function - to regulate the capacity and, if necessary, to heat the supplied air. Heating is carried out using a built-in heating element for 1 kW. The maximum temperature of the supplied air can reach + 30 ° С.

    In practice, it looks like this:

    • we are leaving for a long time - we set the capacity of the installation to 5 - 10%;
    • we return - we transfer to a full-fledged working mode.

    The installation of the recuperator on vibration suspension, the distribution of air ducts and the commissioning of the ventilation system were carried out by the specialists of the company where the equipment was ordered. It should be noted that the system is working, there is a slight heating and the impressions are still the most positive.

    Installation of ventilation ducts in a frame house.

    It is also worth talking about electricity. The house was entered with a 5 x 6 cable. Accordingly, purchased and installed:

    • two-pole input circuit breaker;
    • switchboard ABB;
    • distribution boxes and strips;
    • machines 16-40A (10 pcs).

    The wiring inside the house is carried out in a metal hose inside the walls. The passage through the load-bearing elements of the frame is made through pre-drilled holes.

    The interior decoration was made from my favorite material - wood. Although sometimes a worm of doubt crept in, who wanted drywall and wallpaper. They say it's easier and more elegant. But the tree still won unconditionally.

    I started the cladding from the second floor. Used larch lining 110 mm, in half extra grade and grade A. The higher the quality of the material, the easier, easier and faster to work with.

    In addition, more high-quality lining no waste due to the absence of cracks, knots, resin pockets and deformation, which are so rich in varieties AB and B.

    Interior decoration of the attic walls of a frame house.

    It was decided to make the living room a little more pretentious so that there would be no associations with a beautiful shed:

    The bottom of the walls, up to a level of approximately 80 - 100 cm, is still sheathed with larch clapboard. Above, from this level to the very top, I fastened the abasha lining. The whole artistic sophistication lies in the orientation (vertical) and the alternation of wide and narrow boards. Of course, I had to tinker a little, but overall it looks very good.

    In other rooms, the walls are also sheathed with alternating boards, but in the usual horizontal orientation.

    To prevent the insulation from getting wet, from the side of the room it is closed with a Tyvek vapor barrier. The joints were glued with metallized tape.

    Slowly, as the finishing is completed, you can begin to settle down. Attic sofa.

    A wardrobe in a niche on the second floor. The wardrobe turned out to be very roomy. Somewhere around three cubes. There is where to turn around, or rather keep within.

    The work does not go one after the other, but as the weather permits, the availability of materials, the presence of other urgent matters. External finishing frame country house 6 x 8 was made exactly according to this principle.

    On top of the installed one, Izoplata pulled TechnoNIKOL wind insulation onto the walls. Classic technology:

    • overlap rolls by 15 - 20 cm;
    • fastening with a stapler.

    Everything else was sewn up already in the spring, when it is warm and pleasant to work outside.

    The material for the work is still the same - the same larch paneling, grade A. Advantages - resistant to water, convenient to work (high-quality good material). Disadvantages - expensive, fragile (it is necessary to drill holes for fasteners).

    The overhangs of the roof and wind boards on the gables were sewn up with plastic. Durable (does not rot), aesthetically pleasing and easy to assemble. From whatever side you look, there are solid pluses everywhere.

    Land improvement

    The house is almost ready. You can already live. Although there are still many imperfections. The time has come to ennoble the site and ensure a comfortable life.

    So, we started with the fence. Wicket posts. Base casting, shaped tube, cover facing brick... Everything seems to be clear, there is nothing daunting and tricky.

    By the same principle, we make the entire fence 40 meters. We attach painted corrugated board to the posts. As they say cheap and cheerful.

    The most important part of the fence is the automatic sliding gate. Very convenient, although not so cheap anymore.

    Well, as for the amenities, a sewerage was made. A septic well was dug and a sewerage system was laid. Now in a two-story frame house 6 x 8 baths, toilet, shower and other signs of civilization take place and can function in full.

    My mistakes and conclusions after the construction of a 6x8 frame house

    The experience gained shows that 6 x 8 turnkey on our own is quite real. Salaried workers were recruited to the foundation, stove, and ventilation. Digging a well does not count, since it is rather an accomplishment and has an indirect relationship to construction.

    Looking back, I would like to draw several important conclusions:


    Summing up the overall result, we can say that it is quite possible to make a dream come true. And the independent realization of the dream reduces the price of a 6 x 8 frame house by one and a half - two times, which means it makes the dream even more attractive and achievable.

    Those who decide to build their own house often do not know where to start. But the layout of the rooms is far from the very first step in the process of building a dwelling. Before developing a project or drawing up a detailed work plan, it is necessary to answer the following questions: what is the total living area of ​​the future home; will it be heated; if so, how? The subsequent stages of construction depend on the answers to them.

    Layout one-storey house with stove 6 × 8

    Building 6x6 - most likely country house in which it is possible to live not all year round, but only in the warm season. Therefore, its layout is simple due to its small footprint. Its drawing is also simple due to the lack of a heating system. And for year-round operation, buildings are built more spacious, for example, and larger. But then stove heating is simply necessary.

    However, the construction company can offer with a heating system. It will include a general and detailed construction plan. The customer, who wishes to have a house with a stove, can make his own amendments, which will be immediately taken into account by the contractor. This option is called custom building.

    The client can order from the company not only finished project, but also the construction of a typical house with already resolved planning issues.

    Variant of the internal layout and location of the stove in the house

    If the customer fully accepts the proposed plan, then the construction will cost him significantly less.

    Advantages

    When the layout is well thought out, taking into account the specific heating system, then the installation of the stove practically does not depend on the building material from which the dwelling is built. It is suitable for both wood and brick house... Its advantage is that for space heating there is always wide choose fuels: coal, peat, firewood, even cardboard and dry tree branches. The user decides for himself what to heat, what is more affordable and cheaper.

    Heating with electricity is more expensive, and not all residential areas are equipped with a gas pipeline.

    The next advantage is that the heating of the house does not depend on the heating season of the heating plant, from emergency repairs and long interruptions in the supply of fuel. The furnace is autonomous, its operating mode is determined by the user himself, who does not need a seasonal system shutdown plan.

    The layout of the house with a stove 6 × 9 meters

    The ability of the stove to create a cozy and comfortable atmosphere is well known. Thanks to this quality, no other can compare with it. heating system... It is pleasant, while sitting with a book by the stove, to inhale the smell of tarry wood and listen to their quiet crackling. It is reminiscent of the distant days, steeped in romance. In addition to these advantages, the stove can be equipped in such a way that it will become an original addition to the interior.

    Read also

    Layout of a spacious 10x10 house for a large family

    The Russian stove gives a special charm to the room. In terms of heat capacity, nothing can compare with it. She is able to accumulate heat, and then gradually give it away, maintaining constant coziness and comfort in the hut. In the past, it served as a cooking and heating function. It is rather rare today.

    Only those who like the rustic design style of the house will dare to decorate their apartments with it. True, the stove-makers were transferred, who do not need a drawing for its construction. But lately, the project of a house with a fireplace is a common proposal of construction companies. This fashionable heating device heats, but does not accumulate heat at all. It is used more as a decorative element.

    The century of technological progress has made its own adjustments. Today, a house with a stove that runs not only on solid fuel, but also on electricity, gas, and fuel oil is common. But the most affordable heating material is still wood.

    Installation and operation rules

    Form, appearance oven fixes its drawing. Many people try to install it somewhere in the corner so that it does not interfere with anyone, does not take up much space. But this is not the main criterion for the installation. Its most rational location reflects, as a rule, each project of a house with heating developed by the company.

    In, as well as in or in, it is preferable to put the stove structure in the very center.

    Detailed plan of a house with a fireplace stove 8 × 8

    Then the effect from it will be the greatest, because it will successfully warm up all the rooms. As practice has shown, there is no way to install it at outer wall so as not to heat the street.

    If the plan of a dwelling with a stove system is developed professionally, then after its implementation it will be warm and cozy even all year round. It is recommended to plan the stove in suburban areas or not higher than two-story ones. If it is still cool on the second floor, then some residents close it for the winter, living only on the well-heated first floor.

    Read also

    Holiday houses or guest places on your site

    Very important rule: a house with a stove must have effective thermal protection. Otherwise, all efforts to heat it will be in vain. A cash to buy fuel will literally fly into the pipe. You should not save on the insulation of your home. True, not a single company will offer a house project without thermal insulation. But if its layout is with a centralized heating system, then such a construction plan is not suitable for installing a stove.

    Layout Finnish house with oven size 6 × 6

    It is a mistake to think that if you put a powerful stove in a small building, for example, 6x6, then a small amount of firewood will be sufficient for heating. This is not at all the case. All of them will only go to a weak warm-up. And the rooms will stay cold. Each house with a stove is equipped with a heating system corresponding to the space that it is intended to heat. So, if the hearth is 6x9, then heating structure should be more heat-intensive.

    Another important rule that should not be neglected is the installation of the stove on a separate foundation. It cannot be the same for her and for the whole house. This should clearly demonstrate both the general design of the dwelling and a separate drawing of the structure for the firebox.

    Detailed drawing of a log house with a stove size 5 × 6

    The fact is that the soil sags in different ways under different weights. Why the stove can warp, cracks will appear. As a result, the rooms will receive not only heat, but also smoke with carbon monoxide.

    Knowing the installation rules, you should not forget about the rules of use. A house with a stove assumes strict adherence to regulations fire safety... It doesn't matter what area it is, 6x6 or much more. It should be remembered that the chimney damper is closed on time. If the coals are not burned out enough, carbon monoxide will fill the room. And the consequences of this are very sad. If you close it too late, precious heat will escape into the pipe. The oven is usually repaired by the person who installed it.